Welcome to the METALOG training tools World Store

DominoEffect

The domino event.

Delivery Time: approx. 5-7 days (depending on customs regulations)

$460.00
excl. VAT, excl. Shipping Cost

We deliver within 3-4 days.

Call us if you would like more information about the product.

Free 14-day return policy.

We offer 24 months warranty on materials and workmanship.




Details

Details

Themes & Outcomes
working in Teams: jointly developing creative solutions, communication interchange, using team rituals

Project management: making synergy effects tangible, coordination of sub-teams, lines of communication in projects

Organisational development: - working with CIP - Continual Improvement Process, working with limited resources

leadership training: coordination of sub-teams, management of a larger system

 

Activity
You can almost feel the tension and the enthusiasm as the participants delicately set out the dominos! With only a limited amount of time available they have to create a domino cascade. Just as in any project, different teams work on sections of the cascade pattern. There are countless challenges to be met and specific requirements to be fulfilled in the process. Will the group manage to place the dominos in such a way that at least 75% of them fall over when the cascade is started?

 

How It‘s Done
After permission to start is given, the group begin to work feverishly. Coordinated by ‘facilitators’, they concentrate on developing solutions for the various construction challenges. Again and again you hear: “Oh no, not again” when someone accidentally knocks over a domino and, in a split second, demolishes a part of the painstakingly constructed domino line. Only the built-in ‘Emergency Stop’ – two of the dominos removed from the chain – interrupts the premature chain reaction.  Finally everything is ready, the interfaces and crossovers between the various sections are checked. Everything is ready for the release of the chain reaction. At least three quarters of the dominos must fall. To achieve this, the teams have to develop a feeling for the correct distance between the dominos and, in various test phases, to get to grips with the operational reliability of the twists and turns, crossover points, height differences and other challenges. The ‘facilitators’ ensure a smooth flow of communication between the sub-teams encourage the teams to support and motivate one another.

Additional Info

Additional Info

Participants (min/opt/max): 5 / 15 / 35
Time (not including review): 45 – 60 minutes
Space needed Seminar room or outdoor setting with at least 80 sq ft. Optimum is 160 - 320 sq ft
Themes & Outcomes

Themes & Outcomes
working in Teams: jointly developing creative solutions, communication interchange, using team rituals

Project management: making synergy effects tangible, coordination of sub-teams, lines of communication in projects

Organisational development: - working with CIP - Continual Improvement Process, working with limited resources

leadership training: coordination of sub-teams, management of a larger system

 

Contents: Contents of basic set for up to 35 participants: 750 dominos in 5 colours (white, black, blue, green, red) and in 5 separate soft bags, 1 detailed instructions manual.
Delivery time approx. 5-7 days (depending on customs regulations)
Dimensions: 21.7 x 11.2 x 12.6 inches
Weight: 22.1 lbs.